top of page

Millerz Square A1 , Old Klang Road (Tower C,D & E)

The proposed mixed-use development consists of multiple phases, integrating residential, commercial, and office spaces along with essential facilities. Phase 1 includes a podium featuring retail units, office spaces, residential parking, commercial parking, waste collection centers, and utility infrastructure such as a power substation and water tank. Phase 2 introduces a 45-story serviced apartment block with 502 units and residential amenities. Phase 3 comprises a 38-story office tower with 307 units, including office facilities. Phase 4 expands residential capacity with another 45-story serviced apartment block (453 units) and additional retail spaces. Phase 5A features a 43-story serviced apartment block (339 units), residential parking, and a waste collection center, while Phase 5B adds another 43-story serviced apartment block with similar facilities. The development ensures a well-balanced integration of residential, commercial, and office functions, promoting a sustainable and efficient urban environment.

CLIENT

Lim Legacy Development Sdn. Bhd.

COMPLETION STATUS

Complete

START DATE

December 2017

END DATE

November 2020

LOCATION

W.P. Kuala Lumpur

SCOPE OF WORK

Bored Pile, Pilecap, RC Works

PROJECT TYPE

Buildings - Commercial & Residential

Millerz Square A1 , Old Klang Road (Tower C,D & E)

The proposed mixed-use development consists of multiple phases, integrating residential, commercial, and office spaces along with essential facilities. Phase 1 includes a podium featuring retail units, office spaces, residential parking, commercial parking, waste collection centers, and utility infrastructure such as a power substation and water tank. Phase 2 introduces a 45-story serviced apartment block with 502 units and residential amenities. Phase 3 comprises a 38-story office tower with 307 units, including office facilities. Phase 4 expands residential capacity with another 45-story serviced apartment block (453 units) and additional retail spaces. Phase 5A features a 43-story serviced apartment block (339 units), residential parking, and a waste collection center, while Phase 5B adds another 43-story serviced apartment block with similar facilities. The development ensures a well-balanced integration of residential, commercial, and office functions, promoting a sustainable and efficient urban environment.

COMPLETION STATUS

Complete

LOCATION

W.P. Kuala Lumpur

SCOPE OF WORK

Bored Pile, Pilecap, RC Works

PROJECT TYPE

Buildings - Commercial & Residential

bottom of page