KM2, Bukit Jalil
The amendment to the development order dated 14.1.2020 involves the construction of a 31-story apartment complex (Parcel A1), consisting of two 25-story residential blocks with 350 units. The revised plan includes public facilities such as a podium on the 5th floor, a rooftop amenity level, and multi-level parking across four podium floors, a mezzanine, a ground-floor section, and a sub-basement. Additional features include an electrical substation, a security post, and a waste collection area. Situated at Lot 50162, Jalan Jalil Perkasa 7, Mukim Petaling, Kuala Lumpur, the amendment enhances the functionality and livability of the development.
CLIENT
Berjaya Hartanah Sdn. Bhd.
COMPLETION STATUS
Complete
START DATE
August 2023
END DATE
March 2024
LOCATION
W.P. Kuala Lumpur
SCOPE OF WORK
Bored Pile, Pilecap, RC Works
PROJECT TYPE
Buildings - Residential - Apartment
KM2, Bukit Jalil
The amendment to the development order dated 14.1.2020 involves the construction of a 31-story apartment complex (Parcel A1), consisting of two 25-story residential blocks with 350 units. The revised plan includes public facilities such as a podium on the 5th floor, a rooftop amenity level, and multi-level parking across four podium floors, a mezzanine, a ground-floor section, and a sub-basement. Additional features include an electrical substation, a security post, and a waste collection area. Situated at Lot 50162, Jalan Jalil Perkasa 7, Mukim Petaling, Kuala Lumpur, the amendment enhances the functionality and livability of the development.
COMPLETION STATUS
Complete
LOCATION
W.P. Kuala Lumpur
SCOPE OF WORK
Bored Pile, Pilecap, RC Works
PROJECT TYPE
Buildings - Residential - Apartment