top of page

KM2, Bukit Jalil

The amendment to the development order dated 14.1.2020 involves the construction of a 31-story apartment complex (Parcel A1), consisting of two 25-story residential blocks with 350 units. The revised plan includes public facilities such as a podium on the 5th floor, a rooftop amenity level, and multi-level parking across four podium floors, a mezzanine, a ground-floor section, and a sub-basement. Additional features include an electrical substation, a security post, and a waste collection area. Situated at Lot 50162, Jalan Jalil Perkasa 7, Mukim Petaling, Kuala Lumpur, the amendment enhances the functionality and livability of the development.

CLIENT

Berjaya Hartanah Sdn. Bhd.

COMPLETION STATUS

Complete

START DATE

August 2023

END DATE

March 2024

LOCATION

W.P. Kuala Lumpur

SCOPE OF WORK

Bored Pile, Pilecap, RC Works

PROJECT TYPE

Buildings - Residential - Apartment

KM2, Bukit Jalil

The amendment to the development order dated 14.1.2020 involves the construction of a 31-story apartment complex (Parcel A1), consisting of two 25-story residential blocks with 350 units. The revised plan includes public facilities such as a podium on the 5th floor, a rooftop amenity level, and multi-level parking across four podium floors, a mezzanine, a ground-floor section, and a sub-basement. Additional features include an electrical substation, a security post, and a waste collection area. Situated at Lot 50162, Jalan Jalil Perkasa 7, Mukim Petaling, Kuala Lumpur, the amendment enhances the functionality and livability of the development.

COMPLETION STATUS

Complete

LOCATION

W.P. Kuala Lumpur

SCOPE OF WORK

Bored Pile, Pilecap, RC Works

PROJECT TYPE

Buildings - Residential - Apartment