RESOURCES
VIDEOS
To know better our company, top management, staffs and workers.
06
Rafllesia Parcel C5 - Semi - D @ D'sara Perdana
(Strengthening the Existing Slope Terrain with Minimum Disturbance)
14
MAS @ Sultan Ismail
(Method of construction of hand dug caisson under the existing ceiling height constraint)
15
KL Gateway @ Kerinchi
(Corner Strutted Wall: Comparing Actual Wall Displacement Against Predicted Results by 3-D Finite Element Analysis Using Plaxis 3D)
18
Ascencia @ TTDI ( Construction Aspect Phase 1 )
(Earthwork Excavation and R.C.Works Within Strutted Diaphragm Wall)
20
Residence 17 @ Section 17
(Alternative proposal of Cantilever Diaphragm Wall to replace the Temporary Sheet Pile Shoring System
29
MRT 2 BMN @ Sungai Besi
(Fissure Ground Treatment and Ground Anchor Work at Bandar Malaysia North Station)
31
Hampton Residence @ Country Heights Damansara
(The Proposed Temporary Anchored Soldier Pile Wall and Challenges)
32
The Estate @ Bangsar South
(The Alternative Design of Piling and Retaining Wall and Construction Challenges)
33
PV D7 RMM - Condo @ Setapak
(The Proposed Bored Pile System to expedite overall progress, Design Challenges and Construction Challenges)
34
WJ2 PV RMM 1 @ Kampung Wirajaya
(The Proposed Larger Bored Pile to expedite overall progress and Construction Challenges)
35
The Hermington @ Kuchai Lama 1
(Alternative Design Proposal, Design Challenges, Operation Issue and Construction Difficulties Encountered)
39
Sunway Avila @ Wangsa Maju
(Solutions on Encountered Shale Rock Layer and Liftcore Construction Challenges)
WRITE - UP
To learn more our past projects, construction challenges, design challenges and solutions.